As shown in the above picture, the first phase of the landmark Stormwater Filtration System at Bay Park was begun last month with the construction of the Denitrification Trench. The trench is five feet wide by five feet deep with the bottom covered with specially treated wood chips that attract anerobic bacteria that consume nitrogen [...]
